Monitoring the Dartford Crossing

机译:监控达特穿越

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Although being late to the design table doesn't really affect the M&E supplier and their ability to do the job required, it can have consequences for ongoing asset management, with potential implications for operations, safety, maintenance and therefore, cost of ownership. As our experience has verified, this is especially true where the role of the supplier is to provide system integration services and make a variety of disparate M&E systems work together.
机译:尽管迟到不设计表真正影响机电供应商和他们的能力做这项工作需要,它可以产生影响正在进行资产管理,潜力影响操作、安全、维护因此,拥有成本。经验验证,尤其如此供应商的角色是提供在哪里系统集成服务和各种各样的各种机电系统一起工作。