...
首页> 外文期刊>Highways >Dispute busting
【24h】

Dispute busting

机译:争端破坏

获取原文
获取原文并翻译 | 示例

摘要

Resolving disputes - not really what Operators want to consider at the outset of negotiating a PPP O&M Contract (the O&M Contact). However, a Dispute Resolution Procedure (DRP) lives with the contract for its duration. If it is not responsive to the needs of an Operator then it is the source of endless frustration as well as a hindrance to effective risk maintenance. Any PPP road project has many interconnecting contracts - the head contract being the PPP Model Contract (the Contact) and the O&M Contract obligations flowing therefrom. This contractual interdependence, coupled with a complex mix of time pressures to close and financing arrangements ensure that when drafting a DRP, adequate thought must be given to ensuring clear and unambiguous clauses which seek to facilitate the speedy and effective resolution of any disputes as they arise.
机译:解决争端,而不是真正的运营商要考虑在谈判的开始购买力平价的各项合同(运营管理)联系。争端解决过程(DRP)生活合同的持续时间。对操作员那么的需要无尽的挫折以及的来源阻碍有效维护风险。路项目——有许多互相连接的合同合同是PPP模式合同(接触)和各项合同义务流动。相互依存,加上一个复杂的混合时间压力和融资安排确保当起草一份组成,足够的思想必须保证清晰和明确的条款寻求帮助快速有效的解决纠纷出现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号