...
首页> 外文期刊>Highways >Battling against winter
【24h】

Battling against winter

机译:应对冬季

获取原文
获取原文并翻译 | 示例

摘要

The next phase of construction on the M25 between junctions 12 and 14 is ready to start. It is hoped the project will make it easier for motorists to negotiate the stretch on dark winter nights. The next phase requires new traffic management, which is currently being put into place. The new traffic management will remove the contraflow and the crossovers and return traffic to its correct carriageways. This new system will benefit motorists as they will not have to negotiate crossing over the carriageway in the dark. They will also benefit from new temporary lighting, which has been installed in the verges, and residents will benefit from the newly completed noise barrier.
机译:下一阶段的建筑之间的M25公路连接12和14已经准备好开始。希望该项目将使它更容易司机协商伸展在黑暗的冬季晚上。管理,目前被投入的地方。逆流式和跨界车返回流量其正确的车道。司机,因为他们不会受益谈判的车道交叉黑了。照明,安装在路边的绿化带上,和居民将受益于新完成了隔音屏障。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号