...
首页> 外文期刊>Highways >A joined up approach
【24h】

A joined up approach

机译:连接起来的方法

获取原文
获取原文并翻译 | 示例

摘要

When a 2.4 mile section of the A72 between Garrion Bridge and Overton Farm which forms part of the Clyde Valley Tourist route was in need of resurfacing a number of challenges had to be faced. A 26-mile diversion route had to be implemented to enact the road closure; public transport had to be re-routed, access to properties and businesses had to be maintained at all times and the work also had to coincide with ongoing slope stability works. As the route was part of a full road safety route action plan a decision was taken to replace all existing signage including chevrons and to upgrade road markings and studs together with footway resurfacing works.
机译:当一个2.4英里的A72 Garrion之间桥梁和Overton农场的哪一部分克莱德谷旅游路线需要必须重修的一系列挑战面对。制定实施道路关闭;运输必须路由访问权属性和企业必须保持在所有时间和工作还必须配合正在进行边坡稳定工作。完整的道路安全行动计划路线的一部分决定是采取替代所有现有的标识包括标记和升级之路标记和小路钉在一起重修的作品。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号