...
首页> 外文期刊>World Steel Capacity News >Duferco Travi e Profilati progresses on bea m mill construction
【24h】

Duferco Travi e Profilati progresses on bea m mill construction

机译:Duferco Beams E probiled E Croping by Beautify by构造

获取原文
获取原文并翻译 | 示例

摘要

Italy's Duferco Travi e Profilati plans to commission a beam mill at San Zeno Naviglio plant by the end of 2022, Metal Expert learnt from the steelmaker's publication.The project track continues according to the schedule, with a reheating furnace is under installation. The steelmaker completes a feasibility study to equip the future unit with a 2 MW photovoltaic unit, aiming to reduce electricity consumption. Earlier the company signed a contract with a wind farm to equip the mill with modern solutions in terms of energy saving, digitization, artificial intelligence tools and automation solutions. As a result, the new mill will fully consume energy from renewable sources.
机译:意大利的Duferco Travi e Profilati计划在2022年底之前在圣卫生Naviglio工厂进行一家横梁磨坊,Metal Experte从Steemaker的出版物中获悉。根据日程安排,项目轨道继续进行,并安装了重新加热的炉子。 这位钢铁制造商完成了一项可行性研究,以使未来的单元配备2 MW光伏的单元,以减少电力消耗。 该公司早些时候与风电场签署了一份合同,以在节能,数字化,人工智能工具和自动化解决方案方面为工厂配备现代解决方案。 结果,新工厂将完全消耗可再生能源的能源。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号