...
首页> 外文期刊>Radwaste Monitor >DOE Won't Pursue Yucca Mountain, Federal Interim Storage, Licenses for Rad Waste
【24h】

DOE Won't Pursue Yucca Mountain, Federal Interim Storage, Licenses for Rad Waste

机译:DOE不会追求丝兰山,联邦临时存储,RAD废物的许可证

获取原文
获取原文并翻译 | 示例
           

摘要

The Department of Energy will seek neither to license a nuclear waste repository at Yucca Mountain in Nevada, nor a federal facility for temporary centralized storage of the radioactive material, Secretary of Energy Dan Brouillette said Thursday. His comments come after Brouillette’s predecessor, Rick Perry, said last fall the agency also has no legal authorization to contract with a commercial operation to take the waste on an interim basis until permanent disposal is available.
机译:能源部周四表示,能源部将不寻求在内华达州尤卡山(Yucca Mountain)的核废料存储库许可,也不会寻求用于临时集中放射性材料的联邦设施。 他的评论发表在布鲁莱特的前任里克·佩里(Rick Perry)表示,去年秋天,该机构还没有法律授权与商业行动合同,以临时浪费,直到永久处置为止。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号