...
首页> 外文期刊>Metals Economics Group Strategic Report >CAPIAL COSTS: MAJOR IRON-ORE EXPANSION PROJECTS IN WESTERN AUSTRALIA
【24h】

CAPIAL COSTS: MAJOR IRON-ORE EXPANSION PROJECTS IN WESTERN AUSTRALIA

机译:资本成本:西澳大利亚州的主要铁矿扩展项目

获取原文
获取原文并翻译 | 示例
           

摘要

In October 2005, BHP Billiton and Rio Tinto responded to China's growing demand for raw materials by announcing expansions that will add a total of 36 million mt/y to global iron-ore output by mid-2009, at a cost of dollar 2.87 billion. BHP Billiton plans to increase its iron-ore mining capacity in Western Australia from 118 million mt/y of ore to 129 million mt/y by the end of 2007 by spending dollar 1.3 billion, with ramp-up expected to take 18 months. BHP Billiton's joint venture partners, Itochu Minerals & Energy and Mitsui & Co, are expected to contribute a further dollar 220 million. At the same time, Rio Tinto plans to spend dollar 1.35 billion on its wholly-owned Yandicoogina mine and port expansions to boost its overall iron-ore shipping capacity in Western Australia from about 175 million mt/y to almost 200 million mt/y. These new expenditures by both companies are in addition to capital already spent or currently being spent on previously announced expansion projects in Western Australia at Mt Newman, Yandicoogina, and West Angelas.
机译:2005年10月,必和必拓(BHP Billiton)和里约·廷托(Rio Tinto)通过宣布扩张将在2009年中期以28.7亿美元的价格宣布扩展,以宣布扩张为中国对原材料的需求不断增长。必和必拓(BHP Billiton)计划在2007年底之前将其在西澳大利亚州的铁矿开采能力从1.18亿吨矿石提高到1.29亿吨/y,耗资13亿美元,预计将需要18个月。必和必拓的合资合作伙伴,Itochu Minerals&Energy and Mitsui&Co,预计将进一步贡献2.2亿美元。同时,里约·廷托(Rio Tinto)计划将13.5亿美元用于其全资Yandicoogina矿山和港口扩建,以将其在西澳大利亚州的整体铁路运输能力从约1.75亿吨/y升至近2亿吨/y。两家公司的这些新支出是为了在西澳大利亚州,纽曼山,Yandicoogina和West Angelas的西澳大利亚州宣布的扩展项目上的资本增加或目前花费的。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号