...
【24h】

Project Status

机译:项目状态

获取原文
获取原文并翻译 | 示例
           

摘要

In May 2007, Technip was awarded a turnkey contract by Total Exploration & Production Nigeria Ltd for the loadout, transport and installation of the topsides of the OFP2 fixed platform on the Ofon field. 19 July 2007, Nigerian National Petroleum Corporation (NNPC) and Total, through its subsidiary Elf Petroleum Nigeria Limited, announced the launch of the Phase 2 of Ofon Field Development Project. The new phase of the field development project will eliminate gas flaring in Ofon, in line with the policy of the Federal Government of Nigeria, and give support to the NNPC/EPNL Joint Venture meeting its gas commitments. Gas will be monetised through the NLNG plant. In addition, all produced water will be reinjected into the reservoir. Akmos Global Services has.been responsible for the supply of maintenance spare parts for the Ofon platform, which is offshore. Aibel is working on the design of five new platforms, major modification of three existing platforms and required pipelines and cables. In addition Aibel is conducting preparatory work for long lead equipment and EPC contracts. In October 2011, Saipem was awarded the contract to provide EPC, fabrication and installation of the OFP2 jacket and a living quarter platform for phase 2.
机译:2007年5月,Technip被Total Exploration&Production Nigeria Ltd授予了交钥匙合同,用于OFON FIELD上OFP2固定平台的上限,运输和安装。 2007年7月19日,尼日利亚国家石油公司(NNPC)和Total通过其子公司Elf Nigeria Limited宣布了Ofon Field Development Project的第二阶段。现场开发项目的新阶段将根据尼日利亚联邦政府的政策消除爆炸的天然气,并为NNPC/EPNL合资企业提供支持。气体将通过NLNG工厂获利。此外,所有生产的水都将被重新注射到储层中。 Akmos Global Services拥有。 Aibel正在设计五个新平台的设计,对三个现有平台的重大修改以及所需的管道和电缆。此外,Aibel正在为长铅设备和EPC合同进行准备工作。 2011年10月,Saipem获得了合同,以提供EPC,OFP2夹克的制造和安装以及第2阶段的生活区平台。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号