...
首页> 外文期刊>Oil review Africa >G E executes PIP upgrade at plant's two gas turbines
【24h】

G E executes PIP upgrade at plant's two gas turbines

机译:G e在Plant的两个燃气轮机上执行PIP升级

获取原文
获取原文并翻译 | 示例
           

摘要

GE POWER AND Indorama Eleme Petrochemicals Limited (IEPL) have successfully executed GE's 6B performance improvement package (PIP) upgrade on the first two out of six 6B gas turbines at the petrochemical facility in Eleme, Rivers State, Nigeria. The upgrade increased Indorama's plant output by 15 per cent per gas turbine, more than doubling the expected increase of six per cent. The upgrade will help extend the interval for combustion and hot gas path inspections, reducing overall maintenance costs. In addition, this project is expected to increase power plant availability of up to 3,960 hours over 16 years.
机译:GE Power和Indorama Eleme石化有限公司(IEPL)在尼日利亚埃莱姆市埃莱姆市的六架6B燃气轮机中,成功执行了GE的6B性能改进软件包(PIP)升级。 升级将Indorama的工厂产量增加15%,使预期增加了6%。 升级将有助于扩展间隔以进行燃烧和热气路径检查,从而降低整体维护成本。 此外,预计该项目将在16年内提高发电厂的可用性高达3,960小时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号