...
【24h】

rio tinto cuts 2020 copper output guidance

机译:Rio Tinto削减2020铜输出指南

获取原文
获取原文并翻译 | 示例
           

摘要

UK-Australian resources firm Rio Tinto has cut its 2020 production guidance for mined and refined copper because of a potential reduction in second-half output at Escondida in Chile and earthquake repairs to its Kennecott mine in the US. Guidance for mined copper has been lowered to 475,000520,000t from 530,000-570,000t with refined copper lowered to 165,000-205,000t. Its C1 cash cost guidance has been maintained at $1.20-1.35/lb of copper.
机译:英国 - 澳大利亚资源公司里约·廷托(Rio Tinto)削减了2020年的开采和精制铜生产指南,因为智利埃斯孔迪达(Escondida)的下半场产量可能会减少智利的下半场产出,并将地震维修降低到美国的肯尼科特(Kennecott)。 从530,000-570,000T降低到精制铜的指南已降低到475,000520,000T,降低到165,000-205,000T。 其C1现金成本指南的铜指南为1.20-1.35美元。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号