首页> 外文期刊>LNG Shipping & Terminals >Hose-based CNG transfer systems fast-track FSRU projects
【24h】

Hose-based CNG transfer systems fast-track FSRU projects

机译:基于软管的CNG转移系统快速轨道项目

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

With the rapid growth in floating storage and regasification units (FSRUs), hose-based solutions are joining marine loading arms (MLA) as key cargo transfer technologies for ship-to-jetty discharge of compressed natural gas (CNG). Speaking at Riviera's LNG Ship/Shore Interface Conference, Awards and Exhibition in London in November, ContiTech Oil & Marine senior project engineer Gergely Szekely said hose-based CNG transfer solutions are gaining traction for FSRU projects because they offer short lead times. "There are certain fast-tracked projects that would not have been possible using loading arms because of their longer delivery times," said Mr Szekely. "A complete hose-based solution can be designed, manufactured and installed in the course of six months."
机译:随着浮动存储和重新设备(FSRUS)的快速增长,基于软管的解决方案将船用装载臂(MLA)作为关键的货物转移技术,用于船舶到杰特的压缩天然气(CNG)。 Contitech Oil&Marine高级项目工程师Gergely Szekely在Riviera的液化天然气船/岸界面会议上发表讲话,颁奖典礼和展览会在伦敦举行。 Szekely先生说:“由于交付时间更长的时间,有些快速跟踪的项目无法使用装载臂。” “可以在六个月的时间内设计,制造和安装完整的基于软管的解决方案。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号