首页> 外文期刊>LNG Shipping & Terminals >FSRU maintenance:it pays to plan ahead
【24h】

FSRU maintenance:it pays to plan ahead

机译:FSRU维护:提前计划是值得的

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Floating storage and regasification units (FSRUs) have been instrumental in opening new markets to LNG, but careful planning regarding vessel maintenance, inspection and safety has to be taken in the development of any project.During an interview with Riviera Maritime Media's executive editor Edwin Lampert at the LNG Ship/Shore Interface, Europe conference, Tor-Ivar Guttulsrφd, director of FSRU and FLNG, global gas solutions, ABS Europe, noted that most FSRUs are connected to onshore power plant projects, sending gas to power plants to generate electricity.While this might seem straightforward, Mr Guttulsrφd cautioned that there are a number of factors that should be considered when planning a power project which depends on a steady supply of gas from a floating asset.
机译:浮动存储和重新设备(FSRUS)在开放新市场上为液化天然气开放了起源,但是在开发任何项目中,必须对船舶维护,检查和安全进行仔细的计划。 FSRU和FLNG总监Tor-IvarGuttulsrφd在LNG船/岸界面上,ABS欧洲全球天然气解决方案总监Tor-IvarGuttulsrφd指出,大多数FSRU都与岸发电厂项目相连,将天然气发送到发电厂发电。 虽然这似乎很简单,但Guttulsrφd先生警告说,在计划一个依赖浮动资产中稳定供应的电力项目时,应考虑许多因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号