...
首页> 外文期刊>Clinical implant dentistry and related research >Immediate loading of implants placed simultaneously with sinus membrane elevation in the posterior atrophic maxilla: a two-year follow-up study on 10 patients.
【24h】

Immediate loading of implants placed simultaneously with sinus membrane elevation in the posterior atrophic maxilla: a two-year follow-up study on 10 patients.

机译:立即在萎缩性上颌后与窦膜升高同时放置植入物:对10例患者进行两年的随访研究。

获取原文
获取原文并翻译 | 示例
           

摘要

Within the limits of this case series report, it is concluded that maxillary sinus membrane elevation with simultaneous placement and immediate loading of implants without the use of any additional grafting material shows predictable results after 2 years of functional loading. Moreover, evidence of intrasinus bone formation around the implants was found in all patients. Further studies are needed to study the influence of immediate loading on the mineralization of bone forming at dental implant sites.
机译:在该病例系列报告的范围内,得出结论,上颌窦膜高度具有同时放置和立即放置植入物,而无需使用任何其他嫁接材料,在功能负载2年后显示出可预测的结果。 此外,在所有患者中都发现了植入物周围骨内形成的证据。 需要进一步的研究来研究立即加载对牙科植入物部位骨形成矿化的影响。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号