首页> 外文期刊>TEX Energy Report >Coal Production at Cerrejon Coal Mine from January to March is 5.39 Million Tons
【24h】

Coal Production at Cerrejon Coal Mine from January to March is 5.39 Million Tons

机译:Cerrejon煤矿从1月到3月的煤炭生产是539万吨

获取原文
获取原文并翻译 | 示例
           

摘要

5.39 million tons of coal was produced at Cerrejon open-cut coal mine, a large-scale thermal coal mine in Colombia in the period from January to March in 2021. This represents a decrease of 550,000 tons (9.3%) versus the yearearlier period.Besides, the coal sales volume from January to March was 5.243 million tons, down by 847,000 tons (13.9%)from the year-earlier period.At Cerrejon coal mine, the workers under the umbrella of SintraCarbon as the biggest labor union at the said coalmine implemented a large-scale strike for a period of 91 days from 31 August 2020, as a consequence of which the coalproduction and sale at the said coal mine in 2020 dropped sharply.
机译:在一月至2021年间,哥伦比亚的一个大型热工煤矿Celron露天煤矿,生产了539万吨煤。与上年同期相比,这意味着减少了55万吨(9.3%)。此外,1-3月煤炭销量524.3万吨,同比下降84.7万吨(13.9%)。在Cerrejon煤矿,该煤矿最大的工会SintraCarbon旗下的工人从2020年8月31日起实施了为期91天的大规模罢工,导致该煤矿2020年的煤炭生产和销售大幅下降。

著录项

  • 来源
    《TEX Energy Report》 |2021年第4298期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号