首页> 外文期刊>Platts Metals Daily >AngloGold Ashanti suspends production guidance at Obuasi mine in Ghana
【24h】

AngloGold Ashanti suspends production guidance at Obuasi mine in Ghana

机译:Anglogold Ashanti暂停了加纳Obuasi Mine的生产指导

获取原文
获取原文并翻译 | 示例
           

摘要

AngloGold Ashanti – the world’s third-largest gold mining company – said it suspended its 2021 production and cost guidance for its Obuasi gold mine in Ghana, after a collapse May 18 that led to a suspension of operations at the mine. “Early indications are that this geotechnical incident was likely caused by the failure of a horizontal, or sill pillar, in one of the mine’s smaller mining stopes. A thorough investigation into the event has been initiated,” the company said in a statement May 26. It said it will undertake an “in-depth area-by-area assessment of the mine design, mine schedule and ground management plans, before progressively releasing mining areas for a phased resumption in production.”
机译:世界第三大黄金矿业公司AngloGold Ashanti说,在5月18日的一次坍塌之后,该公司暂停了其在加纳奥布阿西金矿的2021次生产和成本指导。该公司在5月26日的一份声明中说:“早期迹象表明,这起岩土工程事故可能是由于该矿一个较小采矿场的水平或底柱发生故障造成的。已开始对事件进行彻底调查。”。该公司表示,将“对矿山设计、矿山进度和地面管理计划进行逐区深入评估,然后逐步释放矿区,分阶段恢复生产。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号