首页> 外文期刊>SBB Steel Markets Daily >BHP bumps up 2020-21 iron ore guidance on Samarco restart, softens met coal outlook
【24h】

BHP bumps up 2020-21 iron ore guidance on Samarco restart, softens met coal outlook

机译:BHP颠簸2020-21铁矿石对Samarco重启的指导,软化达煤前景

获取原文
获取原文并翻译 | 示例
           

摘要

Sydney—Mining giant BHP bumped up its fiscal 2020-2021 (July- June) iron ore production guidance following the restart of its joint venture Brazilian Samarco operation, while its metallurgical coal output is expected to be in the lower end of the forecast range due to weather impact. BHP now expects iron ore production of 245 million-255 million mt for the current fiscal year, which is up from the previous range of 244 million-253 million mt. The added tonnes are all due to Samarco, while BHP's Western Australian Iron Ore guidance has remained unchanged at 276 million-286 million mt, the company said Jan. 20.
机译:悉尼矿业巨头必和必拓(BHP)在重启合资企业巴西萨马尔科(Bazilian Samarco)后,提高了2020-2021财年(7月至6月)铁矿石生产指导,同时由于天气影响,其冶金煤产量预计将处于预测范围的低端。必和必拓目前预计本财年的铁矿石产量为2.45亿至2.55亿公吨,高于之前的2.44亿至2.53亿公吨。必和必拓1月20日表示,新增的铁矿石产量均应归功于萨马尔科,而必和必拓的西澳大利亚铁矿石指导值保持不变,为2.76亿至2.86亿公吨。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号