首页> 外文期刊>Metal Bulletin Daily >AT A GLANCE: Rio Tinto’s iron ore production down 2% in Q1, Pilbara shipments up 7%
【24h】

AT A GLANCE: Rio Tinto’s iron ore production down 2% in Q1, Pilbara shipments up 7%

机译:一目了然:里约热内碟的铁矿石产量下跌2%,Q1,Pilbara出货7%

获取原文
获取原文并翻译 | 示例
           

摘要

A summary of multinational mining company Rio Tinto’s firstquarter 2021 production results from its latest production report released on Tuesday April 20. In brief ? Iron ore production at Pilbara (100% basis) in the first quarter of 2021 was 2% lower year on year due to fixed plant reliability and above average wet weather at the mines. In the first quarter, labor resource availability and weather challenges disrupted maintenance in the mine processing facilities which will be prioritized for the rest of the year. Full-year iron ore guidance remains unchanged.
机译:从4月20日星期二发布的最新生产报告来看,跨国矿业公司力拓的第一季度产量达到2021。简言之由于固定的工厂可靠性和高于平均水平的潮湿天气,在2021的第一季度,皮尔巴拉(100%基础)的铁矿石产量比上年低2%。在第一季度,劳动力资源的可用性和天气挑战干扰了矿山加工设施的维护,这将是今年剩余时间的优先事项。全年铁矿石指导值保持不变。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号