...
首页> 外文期刊>Energy Argus petroleum coke >Citgo cuts capex by 19pc after turnaround delay
【24h】

Citgo cuts capex by 19pc after turnaround delay

机译:在周转延迟之后,Citgo通过19pc削减资本资本

获取原文
获取原文并翻译 | 示例
           

摘要

Refner Citgo will cut capital spending by 19pc this year compared to previous plans after pushing back a scheduled turnaround at its 157,500 b/d Corpus Christi refnery in Texas. Citgo did not provide a reason for moving a planned turn- around at Corpus Christi from the fourth quarter of 2021 to the frst quarter of next year. A fuid catalytic cracking (FCC) unit and a sulphur recovery unit (SRU) at the refnery were upset in May and July, respectively, from heavy rain. Those measures followed a complete, two-week shutdown in the frst quarter amid a winter freeze in Texas.
机译:与之前的计划相比,Refner Citgo今年将削减19%的资本支出,此前该公司推迟了德克萨斯州Corpus Christi refnery 157500桶/日的计划周转期。CITGO没有提供一个理由,从2021季度的第四季度到明年的第二季度,推动计划在科珀斯克里斯蒂转机。5月和7月,该餐厅的一个燃料催化裂化(FCC)装置和一个硫磺回收装置(SRU)分别因大雨而停运。在采取这些措施之前,德克萨斯州第一季度因冬季严寒而完全关闭了两周。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号