...
首页> 外文期刊>World Steel Capacity News >Krakatau Steel's new hot strip mill still waits for commissioning
【24h】

Krakatau Steel's new hot strip mill still waits for commissioning

机译:Krakatau Steel的新款热带磨坊仍然等待调试

获取原文
获取原文并翻译 | 示例
           

摘要

Indonesia's Krakatau Steel's new hot strip mill at the plant in Krakatau Industrial Estate Cilegon (KIEC), Cilegon, has not come on stream yet, Metal Expert learnt from the company's representative. The pre-commissioning activities at the line began in September 2019, while manufacturing of the first coil was scheduled for March 2020. One of the reasons for the delay is a departure of foreign engineers due to the pandemic. Nevertheless, according to the source, up to date, some specialists involved into the project have returned to Indonesia, making it possible to continue preparations for commissioning.
机译:金属专家从该公司代表处获悉,印尼克拉卡托钢铁公司在克拉卡托工业区奇勒贡(基辅)工厂的新热轧带钢轧机尚未投产。该生产线的预调试活动于2019年9月开始,第一个线圈的制造计划于2020年3月进行。延误的原因之一是由于大流行导致外国工程师离职。然而,据消息来源称,到目前为止,参与该项目的一些专家已返回印度尼西亚,使其能够继续为调试做准备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号