首页> 外文期刊>World Steel Capacity News >Baosteel procee ds with new equipment erection at Zhanjiang Iron and Steel
【24h】

Baosteel procee ds with new equipment erection at Zhanjiang Iron and Steel

机译:宝钢Procee DS与湛江钢铁和钢铁新设备勃起

获取原文
获取原文并翻译 | 示例
           

摘要

China's Baosteel Group has completed the installation of a top gas system for a new 4.02 million tpy blast furnace No.3 within expansion of Zhanjiang Iron & Steel in Guangdong province, Metal Expert has learned from local sources. Besides, a 350-tonne BOF No.4 with capacity of 3.625 million tpy was successfully installed at the site that marked the completion of the large technological equipment installation.
机译:金属专家从当地消息来源获悉,中国宝钢集团已在广东省湛江钢铁扩建项目内完成了新建402万吨/年3号高炉的顶煤气系统安装。此外,在现场成功安装了350吨级4号转炉,产能为362.5万吨/年,标志着大型技术设备安装的完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号