首页> 外文期刊>World Steel Capacity News >Chengdu Changfeng Steel Group advances investment project
【24h】

Chengdu Changfeng Steel Group advances investment project

机译:Cheng度C行风steel group advances investment project

获取原文
获取原文并翻译 | 示例
           

摘要

China’s Chengdu Changfeng Steel Group advances its project for the new equipment installation at the third site in Dujiangyan City, Sichuan Province. Primetals Technologies supplies a 100-tonne EAF Quantum (1 million tpy) to melt scrap of different composition and quality and a 120-tonne twin ladle furnace at the third site. The plant-builder also supplies a 6-strand billet CCM (970,000 tpy) and a 946,700 tpy bar mill. The equipment commissioning is scheduled for June 2021, a company’s insider told Metal Expert.
机译:中国成都长丰钢铁集团在四川省都江堰市的第三个工厂推进新设备安装项目。普锐特技术有限公司在第三个工厂提供100吨电弧炉(100万吨/年),用于熔化不同成分和质量的废钢,以及120吨双钢包炉。该厂还提供一台6流方坯连铸机(970000吨/年)和一台946700吨/年棒材轧机。一位公司内部人士告诉金属专家,设备调试计划于2021年6月进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号