首页> 外文期刊>World pipelines >Over 50% of TAP pipes have been laid in Greece
【24h】

Over 50% of TAP pipes have been laid in Greece

机译:超过50%的龙头管道已经铺设在希腊

获取原文
获取原文并翻译 | 示例
           

摘要

The construction progress of the Trans Adriatic pipeline (TAP) was presented by TAP AG's Country Manager for Greece Katerina Papalexandri at the 2nd Thessaloniki Summit, held on 5 - 6 October at the loannis Vellidis Congress Centre. In the context of 'the new energy map in the region' panel, Papalexandri. noted the importance of the project for Greece and the wider area of southeast Europe, as well as the continent as a whole. She also referred to the steady progress - well within schedule and on track - of works in all three northern Greek prefectures traversed by the pipeline.
机译:10月5日至6日,TAP AG希腊地区经理Katerina Papalexandri在loannis Vellidis会议中心举行的第二届塞萨洛尼基峰会上介绍了跨亚得里亚海管道(TAP)的施工进度。在“该地区的新能源地图”小组的背景下,Papalexandri。注意到该项目对希腊和更广泛的东南欧地区以及整个欧洲大陆的重要性。她还提到了管道穿越的希腊北部所有三个县的工程稳步进展——完全在计划内,并在轨道上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号