【24h】

GUEST COMMENT

机译:访客评论

获取原文
获取原文并翻译 | 示例
       

摘要

Escalating setbacks to US pipeline projects have introduced legal and regulatory uncertainties that threaten access to North America's abundant energy resources. Outdated and often redundant permitting rules and activistled litigation have allowed natural gas and oil industry opponents to obstruct infrastructure development, resulting in the recent cancellation of the Atlantic Coast Pipeline, the possible shutdown of the Dakota Access Pipeline, and continued delays to the development of the Keystone XL Pipeline - the latter of which has been ongoing for more than 11 years.
机译:美国管道项目不断升级的挫折带来了法律和监管方面的不确定性,威胁到北美丰富的能源资源。过时且经常重复的许可规则和激烈的诉讼使得天然气和石油行业的反对者阻碍了基础设施的开发,导致大西洋海岸管道最近被取消,达科他州接入管道可能被关闭,Keystone XL管道的开发持续拖延——后者已经持续了11年多。

著录项

  • 来源
    《World pipelines》 |2020年第suppla期|共1页
  • 作者

    Robin Rorick;

  • 作者单位

    American Petroleum Institute;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道运输;
  • 关键词

  • 入库时间 2022-08-20 19:29:17

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号