Key Techniques for Construction of 40.7 m-Span Simply-Supported Girders of South Approach Bridge of Wuhu Changjiang River Rail-cum-Road Bridge

机译:建设40.7 M跨度简单支持的芜湖南方桥梁桥梁桥梁的关键技术

获取原文
获取原文并翻译 | 示例
           

摘要

ublishercopyright>? 2019, Journal Press, China Railway Bridge Science Research Institute, Ltd. All right reserved.? 2019, Journal Press, China Railway Bridge Science Research Institute, Ltd. All right reserved. The main girder for lower railway deck of the south approach bridge of Wuhu Changjiang River Rail-cum-Road Bridge on the newly built Shangqiu-Hefei-Hangzhou Railway is composed of 40.7 m-span railway twin simply-supported PC box girders, which is constructed with the general scheme of in-site casting + transverse sliding. The rightward girders are cast in situ, and the leftward girders are cast in the site of right girders and then transversely slid to the design site on the left along slide way at top of piers. Combined the arrangement of bridge spans with the geological conditions, an inclined-column formwork system that is composed of pier-side columns, inclined-column sat mid-span, and single-layer Bailey beam is adopted to construct the simply-supported girders at the 4×40.7 m segments near the Changjiang River side, which is set up on one side. The simply-supported girders at two 18×40.7 m segments are constructed by adopting movable shuttering form, in which deck-travelling with longitudinal opening and closing is adopted, and side formwork and bottom form work can be longitudinally opened.The main girder for lower railway deck of the south approach bridge of Wuhu Changjiang River Rail-cum-Road Bridge on the newly built Shangqiu-Hefei-Hangzhou Railway is composed of 40.7 m-span railway twin simply-supported PC box girders, which is constructed with the general scheme of in-site casting + transverse sliding. The rightward girders are cast in situ, and the leftward girders are cast in the site of right girders and then transversely slid to the design site on the left along slide way at top of piers. Combined the arrangement of bridge spans with the geological conditions, an inclined-column formwork system that is composed of pier-side columns, inclined-column sat mid-span, and single-layer Bailey beam is adopted to construct the simply-supported girders at the 4×40.7 m segments near the Changjiang River side, which is set up on one side. The simply-supported girders at two 18×40.7 m segments are constructed by adopting movable shuttering form, in which deck-travelling with longitudinal opening and closing is adopted, and side formwork and bottom form work can be longitudinally opened.
机译:ublishercopyright>?2019年,中国铁路桥梁科学研究院学报出版社版权所有?2019年,中国铁路桥梁科学研究院学报出版社版权所有<新建商丘至合肥至杭州铁路芜湖长江铁路公路大桥南引桥铁路下桥面板主梁由40.7m跨铁路双简支PC箱梁组成,总体方案为现浇+横向滑移。右梁现浇,左梁在右梁位置浇筑,然后沿墩顶滑道横向滑动至左侧设计位置。结合桥梁跨径布置和地质条件,在靠近长江侧的4×40.7m区段,采用由墩边柱、跨中斜柱和单层贝雷梁组成的斜柱模板体系,在一侧设置简支梁。两段18×40.7m的简支梁采用活动模板施工,模板采用纵向开合的桥面移动,侧模和底模可纵向开启

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号