首页> 外文期刊>Lead & Zinc Outlook >DUGALD RIVER-- FEATURE ARTICLE – JANUARY 2019
【24h】

DUGALD RIVER-- FEATURE ARTICLE – JANUARY 2019

机译:Dugald River--功能文章 - 2019年1月

获取原文
获取原文并翻译 | 示例
           

摘要

Production just started in the December Quarter of 2017. The mine is relatively high cost and expected to produce on average 170ktpa of zinc in concentrate at a cash cost of US$0.68–0.78/lb of payable zinc for 25 years. There is the potential for value to be added to the project if the copper zone is brought into production at a later stage. The copper zone has 4.4Mt of Inferred Resources grading 1.8% copper and 0.2g/t gold. MMG has not alluded to bringing it into production, AME has left it out of our production forecasts.
机译:None

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号