...
首页> 外文期刊>Lead & Zinc Outlook >GAMSBERG MINE-- FEATURE ARTICLE – SEPTEMBER 2020
【24h】

GAMSBERG MINE-- FEATURE ARTICLE – SEPTEMBER 2020

机译:Gamsberg Mine - 功能文章 - 2020年9月

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Vedanta's Gamsberg project is expected to begin stage one production in the September Quarter of 2018. The project was previously held by Anglo American who looked to develop the project in the early 2000s, however Vedanta then acquired BMM and subsequently Gamsberg. After completing feasibility studies on Gamsberg, Vedanta announced that the Gamsberg project would be developed on a modular basis allowing upfront capex to be lowered. This will see the project initially start in 2018, before ramping up to capacity in 9–12 months to produce approximately 250ktpa of zinc in concentrate. Beyond this, the project will be further developed to see an additional 4Mt of open-cut production and 4Mt of underground production, producing over 600ktpa of zinc in concentrate. Capex for these additional stages is estimated to exceed US$400m.
机译:None

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号