CENTURY-- FEATURE ARTICLE – NOVEMBER 2020

机译:世纪 - 特色文章 - 11月2020年11月

获取原文
获取原文并翻译 | 示例
           

摘要

New Century's 270ktpa Century tailings project is set to become the sixth largest zinc mine in 2020. Its acceleration into the top ten will however be highly contingent on the operation achieving the planned zinc recovery of more than 60% from tailings. Century commenced concentrate production form tailings in August 2018. The operation is forecast to produce on average 205ktpa of zinc in concentrate over a 6.5 year period at a cash cost of US$0.44–52/lb of payable zinc, which positions Century in the middle of AME's cost curve. However, the construction capital expenditure of US$90–100m firmly places the operation in the first quartile of the capital intensity curve. If New Century can achieve the desired recovery, AME expects the operation will process tailings until 2024 before looking to in-situ resources, including the nearby 2.7Mt Silver King, to extend the operation's life.
机译:None

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号