首页> 外文期刊>Automation >Current offshore wind pipeline falls short of the 40GW 2030 target
【24h】

Current offshore wind pipeline falls short of the 40GW 2030 target

机译:目前的海上风管道短缺40GW 2030目标

获取原文
获取原文并翻译 | 示例
           

摘要

Latest figures from Cornwall Insight's 'Renewables pipeline tracker report' show that even if all current offshore wind sites with leasing are developed in the coming years, total offshore wind capacity would only reach 29.7GW by 2030 - nearly 26% short of the 40GW target. The report currently tracks 22 sites across both floating and fixed foundation technologies, with many sites looking to progress through the upcoming Contracts for Difference (CfD) Allocation Round 4.
机译:None

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号