首页> 外文期刊>Argus nefte transport >NMT prepares for bitumen loading
【24h】

NMT prepares for bitumen loading

机译:NMT准备沥青加载

获取原文
获取原文并翻译 | 示例
           

摘要

The NMT fuel oil terminal at Russia’s Black Sea port of Novorossiysk plans to start handling bitumen exports for the frst time in 2024-25. Preparations for NMT bitu- men shipments and the prospects for biodiesel supplies though Novorossiysk’s IPP outlet were outlined by the general-director of both terminals, Maxim Murashko, during a recent interview with Argus. Edited highlights follow: How are plans to develop bitumen and biodiesel loading operations at Novo- rossiysk port progressing? For bitumen, we are in the middle of the initial engineering and design phase. We aim to start loading bitumen at NMT by 2024-25, but potentially earlier — depend- ant on market demand and permitting.
机译:None

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号