...
首页> 外文期刊>Argus Biomass Markets >BIG starts operations at UK biomass power plant
【24h】

BIG starts operations at UK biomass power plant

机译:Big开展在英国生物量发电厂

获取原文
获取原文并翻译 | 示例

摘要

UK biomass investors Bioenergy Infrastructure Group (BIG) has started commercial operations at its 21.5MW waste wood-fired power plant at the Protos site in Ince, Cheshire, which is owned by waste-to-energy technology provider Peel Environmental. The facility will consume up to 170,000 t/yr of waste wood at full capacity and is situated at Peel Environmental's Protos production site. The plant is fully contracted using locally sourced wood.
机译:None

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号