首页> 外文期刊>Argus Biomass Markets >Vantaan Energia targets January 2019 start
【24h】

Vantaan Energia targets January 2019 start

机译:Vantaa Energy Targets 2019年1月开始

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Finnish energy utility Vantaan Energia's 195MW Martinlaakso combined heat and power (CHP) plant in Vantaa, Finland will begin commissioning in January 2019, following the conversion of the old gas boiler to biomass. The plant will generate 195MW of electricity and 330MW of thermal to the grid. It will consume locally sourced wood chips, sawdust, and peat from within 100km of the plant, reducing the dependence on imported fuels, Vantaa Energia said. The feedstock will be either FSC or PEFC certified. Peat will make up around 10pc of the total feedstock.
机译:None

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号