...
【24h】

Eni fast-tracks new Angolan tie-back

机译:ENI快速跟踪新的Angolan Rie-Back

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Eni has made a new discovery off Angola and aims to fast-track the project and tie it back to an existing FPSO within six months. The Cuica fnd has just been discovered in Block 15/06 in the existing Cabaca development area which is tied back to the Armada Olombendo FPSO on the East Hub. The feld is estimated to hold be- tween 200m and 250m bbl of oil in place and was drilled as a deviated well with the wellhead intentionally close to the existing subsea network.
机译:None

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号