首页> 外文期刊>Africa oil and gas: Breaking news and analysis from Africa >Tullow takes long-term rig as Ghana output slumps
【24h】

Tullow takes long-term rig as Ghana output slumps

机译:Tullow作为加纳输出坍塌的长期钻机

获取原文
获取原文并翻译 | 示例
       

摘要

Tullow Oil has conditionally awarded Maersk a four-year drill-ing contract at its two fagship felds off Ghana to try and coun-teract a slump in production. The company had been hoping to approve an award for the Jubilee Southeast project by now and to have contracted at least one rig to work off Ghana permanently in the years ahead to maintain production at the Jubilee and TEN felds. It has now handed long-term partner Maersk Drilling a US $370m conditional letter of award for the drillship Maersk Ven-turer for four years of development drilling campaign at the two felds. Operations will be supported by local partner Rig-world with work to start at Jubilee next quarter. Technip FMC has been tipped for the subsea.
机译:None

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号