首页> 外文期刊>CRU Wire and Cable News Monthly Report >NKT completes Caithness-Moray 320kV turnkey project
【24h】

NKT completes Caithness-Moray 320kV turnkey project

机译:NKT完成了Caithness-Moray 320kV交钥匙项目

获取原文
获取原文并翻译 | 示例
           

摘要

Denmark's NKT has successfully completed the Caithness-Moray turnkey project which consists of a 320 kV high-voltage direct current (HVDC) XLPE off-and-onshore power cable system covering a total transmission length of 160 kilometres. The link has been in commercial operation since end-2018. NKT said that it used the NKT Victoria for the first time under this project to install the bundled HVDC power cables and fibre optics on the seabed. ABB HV Cable, which was taken over in September 2016 by NKT, won the contract in 2014.
机译:None

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号