首页> 外文期刊>Platt's Oilgram News >North Malay Basin gas project starts up
【24h】

North Malay Basin gas project starts up

机译:北马来盆地天然气项目启动

获取原文
获取原文并翻译 | 示例
       

摘要

Singapore—US-based Hess and Malaysian Petronas have started gas production from the North Malay Basin project offshore Peninsular Malaysia, according to a statement issued Tuesday by EOC Ltd., which has supplied the floating, production, storage and offloading vessel for the project. Oslo-listed EOC said that the FPSO Perisai Kamelia, which is deployed in the Kamelia field of the project, has successfully completed startup and commissioning. The FPSO has a designed capacity of 175,000 Mcf/d, according to a company official.
机译:根据EOC有限公司发布的一份声明,新加坡 - 美国的Hess和马来西亚二勒马斯从北马来的盆地项目开始了北马来的盆地马来西亚马来西亚,该项目为该项目提供了浮动,生产,储存和卸载船。 Oslo列出的EoC表示,部署在该项目的Kamelia领域的FPSO Perisai Kamelia已成功完成启动和调试。 根据一家公司官员称,FPSO的设计容量为175,000 MCF / D.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号