首页> 外文期刊>Platt's Oilgram News >KazMunaiGaz EP revises down oil output target
【24h】

KazMunaiGaz EP revises down oil output target

机译:Kazmunaigaz EP修改了油输出目标

获取原文
获取原文并翻译 | 示例
       

摘要

Moscow—Kazakhstan’s KazMunaiGaz Exploration Production, the upstream arm of state-run KazMunaiGaz, has reduced the 2014 target for crude output at its core producing assets to 8.15 million mt (163,000 b/d) from an earlier proposed level of 8.6 million mt (173,000 b/d). As a result, the target for the next year is now roughly in line with KazMunaiGaz EP’s expected production from its UzenMunaiGaz and EmbaMunaiGaz units for 2013. The outlook change is due to a revision of the 2014 output plan for UzenMunaiGaz to 108,000 b/d, the company said, without providing details of the earlier set target. The revision came despite the fact that in January-November crude production at Uzen- MunaiGaz grew by 5% year on year, KazMunaiGaz EP said.
机译:莫斯科 - 哈萨克斯坦的Kazmunaigaz探索产量,国奔康蒙兹的上游扶手,从早期提出的860万吨(173,000人(173,000) B / D)。 因此,明年的目标现在大致符合2013年的乌扎穆尼达兹和南美州的预期产量。前景变更是由于2014年乌扎穆邦的产出计划到108,000 B / D. 该公司表示,不提供早期设定目标的详细信息。 Kazmunaigaz ep表示,虽然在1月至11月 - 11月 - 11月 - 乌兹纳省的原油产量增长了5%,但Kazmunaigaz EP表示。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号