Baghdad—Iraq has begun loading a tankerat its new single point mooring system in thenorth Arabian Gulf after months of delays, asenior oil ministry official told Platts March 8.“It has now started, at 3 pm [1200GMT],” the official said.The new single point mooring systemwas flowing at 10,000 barrels per hour as of7 pm local time, with a target of 20,000 b/hour, the official said. Sources confirmed theshipment was a purchase by ConocoPhillips.
展开▼
机译:巴格达 - 伊拉克已经开始在多个月的延迟延迟后装载了Tankerat在Thenthe Arabian海湾的新单点系泊系统,Asenior石油部官员告诉Platts 3月8日。“它现在已经开始,下午3点[1200GMT],”官方表示。 官方表示,新的单点系泊系统在每小时每小时10,000桶,每小时每小时流动,目标为20,000 b /小时。 消息来源确认了同学是通过康诺菲斯购买的。
展开▼