首页> 外文期刊>Platt's Oilgram News >ExxonMobil eyes 2017 peak for new field
【24h】

ExxonMobil eyes 2017 peak for new field

机译:Exxonmobil眼睛2017年新领域的峰顶

获取原文
获取原文并翻译 | 示例
           

摘要

Nakhodka, Russia—The ExxonMobil-led consortium developing the Sakhalin 1 project offshore Russia’s Far East expects peak production at the Arkutun-Dagi field of 90,000 b/d to be reached in 2017 and to remain at that level for four to five years, the head of ExxonMobil Russia said May 25. Arkutun-Dagi’s startup is expected in 2014. Glenn Waller was speaking at a project presentation in the port of Nakhodka, where the consortium completed construction of a gravity-based structure for the Arkutun-Dagi platform Berkut, which will add up to 4.5 million mt (90,000 b/d) to the project’s total crude production.
机译:Nakhodka,俄罗斯 - 埃克森美孚领导的联盟开发Sakhalin 1项目离岸俄罗斯的远东预计2017年的Arkutun-Dagi领域的高峰产量将在2017年达到90,000 B / D,并留在这一级别四到五年,这 埃克森美孚·俄罗斯负责人表示,5月25日。Arkutun-Dagi的初创公司预计2014年是2014年。Glenn Waller在Nakhodka港口的项目介绍,该联盟完成了Arkutun-Dagi平台Berkut的基于重力的构建。 这将增加450万吨(90,000毫升),以项目的总粗产量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号