首页> 外文期刊>Coal Trader >Illinois coal-fired plant to restart Friday after forced outage: co-op
【24h】

Illinois coal-fired plant to restart Friday after forced outage: co-op

机译:强迫中断后,伊利诺伊州的煤炭植物将重新启动:合作社

获取原文
获取原文并翻译 | 示例
           

摘要

Southern Illinois Power Cooperative’s 300-MW Lake of Egypt power plant is expected to resumecommercial operations Friday after a tube leak caused by coldweather forced the two-unit station offline several days ago, anexecutive said.“We lost a couple of days of burn, but it’s coming back hereFriday afternoon,” SIPC CEO Don Gulley told S&P Global PlattsThursday. “We took advantage of some higher [electricity market]prices” prior to the forced outage, “but we’re missing out today andtomorrow.”
机译:南伊利诺伊州电力合作社的300兆瓦湖埃及电厂预计将在几天前迫使我的枪泄漏在几天前迫使双单位站造成的管道泄漏后,展示。“我们失去了几天的烧伤,但是 它来到这里下午的下午,“SIPC首席执行官Don Gulely告诉S&P Global Plattsthursday。 “我们在强迫中断之前,我们利用了一些更高的[电力市场]价格”,但我们今天失踪了。“

著录项

  • 来源
    《Coal Trader》 |2018年第4期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号