首页> 外文期刊>Coal Trader >NiPsCO RFPs aim at replacing coal with ‘least- cost’ solar, wind
【24h】

NiPsCO RFPs aim at replacing coal with ‘least- cost’ solar, wind

机译:NIPSCO RFP旨在用“最低成本”的太阳能,风

获取原文
获取原文并翻译 | 示例
       

摘要

The power market in northern Indiana is facing a significant transformation as NiSource’s Northern Indiana Public Service Co. (NIPSCO), through requests for proposals, expects to be able to replace 2,094 MW of retiring coal-fired capacity with about 2,300 MW of wind and solar generation. Some of the renewable power will be paired with battery storage. NIPSCO has said the objective of its plan is to ensure it can transition to the “least-cost, cleanest portfolio available.” NIPSCO has said it will issue three separate RFPs in 2019, one for wind resources, one for solar resources and one for thermal/other capacity resources, and that the RFPs “will satisfy capacity need in 2023.” On Wednesday, notices of intent with pre-qualification documents are due, while final proposals are due November 20.
机译:印第安纳州北部的电力市场正面临着尼苏斯北部印第安纳州公共服务公司(NIPSCO)的重大转型,通过提出建议,预计能够用大约2,300兆瓦的风和太阳能替换2,094兆瓦的退休燃煤能力。 一代。 一些可再生电源将与电池存储配对。 Nipsco表示,其计划的目标是确保它可以转变为“最低成本,最清洁的投资组合”。 NIPSCO表示,2019年将在2019年发布三个单独的RFP,一个用于风资源,一个用于太阳能资源,一个用于热/其他能力资源,而RFPS将在2023年满足能力需求。“ 星期三,与资格预审文件的意图通知是由于11月20日的最终提案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号