...
首页> 外文期刊>日本舶用機関学会誌 >Verification test for modernized machinery system of coastwise cargo vessel
【24h】

Verification test for modernized machinery system of coastwise cargo vessel

机译:海岸货船现代化机械系统的验证试验

获取原文
获取原文并翻译 | 示例
           

摘要

At present, the operation structures and technical developments of coastwise Liners are facing a turning point.Since early 1997, the modernization of ship machinery system of a 499 gross tonnage coastwise steel-cargo vessel is designed by the Modernization Committee of Coastwise Vessels and subsidized by the Ship and Ocean Foundation.As design concepts of the modernization, modular fabricated machinery units, an integrated automatic control system of engine room machinery at the bridge and an inverter control system of sea water cooling pump, drainless measures, a combined useelectric generator for the bow-thruster are mainly adopted.Effectiveness of this modernization project is surveyed during the verification test from February 1997 to March 1998.As a result, modular fabrication contributed to reduce the construction period and cost, the drainless measures contributed to reduce the workload and cleaning time for the engine crews, and the inverter system saved the total electric consumption.This verification test apparently proposes for considerations of the modernization for the coastwise vessels from financial, technological and workload points of view.
机译:目前,海岸线划线的操作结构和技术开发面临着一点转点。1997年初,499吨吨位船舶船舶船舶的现代化由海岸船的现代化委员会设计,并补贴船舶和海洋基金会。现代化的设计概念,模块化制造的机械单元,桥上的机械机械集成自动控制系统和海水冷却泵的逆变器控制系统,无水措施,组合使用电发电机主要采用了弓箭推进器。在1997年2月至1998年3月的验证试验期间,这种现代化项目的影响力是一项结果,模块化制造有助于降低施工期和成本,无流程措施促使减少工作量和清洁发动机工作人员的时间,逆变器系统保存了总电气缺点umpation.this验证测试显然提出了从财务,技术和工作量的观点来看沿海船舶的现代化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号