An Outline of the Onahama Coal Center of the Tokyo Electric Power Co. (TEPCO) - A Construction of Coal Center Aiming Efficiency Transportation

机译:东京电力有限公司(TEPCO)奥纳哈山煤中心的概要 - 煤炭中心瞄准效率运输建设

获取原文
获取原文并翻译 | 示例
       

摘要

TEPCO has been constructing the Hirono Thermal Power Station No.5 Plant, and the Plant will start operating in July 2004. The thermal power plant uses coal for fuel, however, the construction site is small for a stock of coals, and an oceangoing coal carrier is unable to be brought alongside the wharf because of shallow water around the plant. Therefore, Onahama Coal Center is located 30km south of the Hirono Thermal Power Station as a coal relay center, where receiving coals from an oceangoing coal carrier, then, transports to the Hirono Thermal Power Station by a self unloading type coal carrier as a secondary transportation. Although the Coal Center was scheduled to construct and operate by Nihon COM Co., the TEPCO is to be constructed and owned it since Nihon COM Co. liquidated at the end of March 2003. The construction has been progressing since February 2003, towards the commencement of the commercial operation in February 2004. The features of this coal center are as follows: (1) Since equipments for unloading and loading coals are installed in the public wharf, the TEPCO should consult with Fukushima prefecture as the port authority in progress of layout, and the coal center is duly taken into consideration for users at the wharf with careful attention to a route of a coal transportation conveyer and height etc. (2) Considering environment, it is adopted the sealing formula conveyor belt to prevent scattering coal dust at the loading and harmonious colors with the scenic aspects of the surrounding port facilities, etc., and also the TEPCO endeavors to reduce the cost by utilizing facilities effectively which were used by Nihon COM Co.
机译:Tepco一直在建造Hirono热电区No.5植物,该工厂将于2004年7月开始运营。热电厂使用煤炭燃料,然而,建筑工地小煤炭和海洋煤炭由于植物周围的浅水,载体无法与码头一起带来。因此,Onahama煤中心位于Hirono火电站以南30公里,作为煤炭中继中心,其中从海洋煤炭载体接收煤炭,然后通过自卸式煤炭载体作为二次运输运输到Hirono热电站。虽然煤炭中心被安排建造并运营NIHON COM CO.,但由于Nihon Co Co公司于2003年3月底,Tepco将被建造并拥有它。自2003年2月以来,建设一直在发展在2004年2月的商业运营中。该煤炭中心的特点如下:(1)由于在公共码头中安装了卸载和装载煤炭的设备,因此Tepco应咨询福岛县作为港口权威在布局进步而且煤中心正式考虑到码头的用户,以仔细注意煤炭输送输送机和高度等的路线,考虑到环境,采用密封配方输送带,以防止散射煤尘随着周边港口设施等风景方面的装载和和谐色彩,以及Tepco的努力通过利用设施减少来降低成本Y由Nihon Co Co.使用

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号