The large capacity pressurized fluidized bed combustion boiler combined cycle power plant

机译:大容量加压流化床燃烧锅炉联合循环发电厂

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Improving the thermal efficiency and environmental characteristics of coal-fired power generation systems, The Chugoku Electric Power Co. and Hitachi Group have developed the first commercial 250-MW PFBC (Pressurized Fluidized Bed Combustion) combined cycle power plant in Osaki. The Osaki PFBC plant was successfully commissioned and its commercial operation commenced on Nov.30, 2000. We introduce main features of the equipment and several trial operation data of the Osaki PFBC plant. The plant is composed of a combined cycle arrangement with a gas turbine and a steam turbine, producing an output of approximately 15% and 85% of the total electricity. It also contains a pressurized fluidized bed combusion boiler which generates steam to drive the steam turbine, where the gas from the boiler is directed to a two-stage multi-cyclone, which drives a gas turbine. The boiler consists of two vessels containing two furnaces, and the gas turbine is a similar type to the one installed at The Chugoku Electric's Yanai Power Station.
机译:提高燃煤发电系统的热效率和环境特征,楚府电力公司和日立集团开发了大阪的第一个商业250兆瓦PFBC(加压流化床燃烧)组合循环发电厂。 Osaki PFBC工厂已成功委托,其商业运营于2000年11月30日开始。我们介绍了设备的主要特点和大阪PFBC工厂的几个试验数据。该工厂由具有燃气轮机和蒸汽涡轮机的组合循环布置组成,产生大约15%和总电力的85%的输出。它还含有加压流化床梳理锅炉,其产生蒸汽以驱动蒸汽涡轮机,其中来自锅炉的气体涉及两级多旋风器,其驱动燃气轮机。锅炉由两个含有两个炉子的血管组成,并且燃气轮机是在楚古电器延泰电站安装的类似类型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号