Analysis of No.3 blast furnace operation of Tanggang works at China based on rist diagram

机译:基于手腕图的中国唐刚厂的3号高炉运行分析

获取原文
获取原文并翻译 | 示例
       

摘要

By applying the Rist model to the blast furnace No.3 of TangGang works (China), the operating lines were calculated through which the coke rate and fuel rate were evaluated. The obtained data were compared to the operating lines in the blast furnace of Muroran works of Hokkai steel. The estimated comparative data clarified the effects of the various operating parameters on the operating line of the blast furnace No.3 of TangGang. From these parameter dependencies, the cause of the high coke rate of the blast furnace No.3 of TangGang works have been discussed; a strong measure for the reduction of the coke rate have been suggested. According to the above, it was confirmed that the Rist model was very effective method to solve the real problems of blast furnaces despite of its simplicity.
机译:通过将RIST模型应用于Tanggang Works(中国)的高炉3号,计算了操作系统,通过该工作线进行了评价焦度和燃料速率。 将获得的数据与Hokkai Steel的Muroran作品的高炉运行线进行了比较。 估计的比较数据阐明了唐刚的高炉3号操作线上的各种操作参数的影响。 从这些参数依赖关系,已经讨论了唐刚作品的高焦炭3号焦炭率的原因; 已经提出了强大的降低焦炭率的措施。 据上述情况,确认,雷特模型是尽管其简单性解决了高炉的真正问题的方法是非常有效的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号