首页> 外文期刊>Journal Of The South African Institute Of Mining & Metallurgy >Addressing misconceptions regarding seismic hazard assessment in mines: b-value, M_(max), and space-time normalization
【24h】

Addressing misconceptions regarding seismic hazard assessment in mines: b-value, M_(max), and space-time normalization

机译:解决矿区地震危害评估的误解:B值,M_(MAX)和时空归一化

获取原文
获取原文并翻译 | 示例
           

摘要

Seismic hazard assessment, in some form or another, has formed part of seismic risk management in seismically active hard-rock mines for decades. Some misconceptions, however, exist in the mining industry which may lead to errors in interpretation and poor risk management decisions. This paper addresses some misconceptions the author has encountered in the mining industry. This is done by exploring the meaning and implications of the frequency-magnitude distribution. The meaning o(M_(max), the methods of assessing it, and the topic of space and time normalization necessary for the evaluation of seismic hazard, are also addressed. The scope of this paper does not include the evaluation of strong ground motion exceedance which also forms part of the evaluation of seismic hazard at mine sites.
机译:以某种形式或另一种形式,地震危害评估已经形成了几十年来在地震活跃的硬岩矿区地震风险管理的一部分。 然而,在采矿业中存在一些误解,这可能导致解释和风险管理决策差的错误。 本文涉及作者在采矿业遇到的一些误解。 这是通过探索频率幅度分布的含义和含义来完成的。 o(m_(max),评估方法的含义,以及评估地震危险所需的空间和时间正常化的主题,也是解决的。本文的范围不包括对强大地面运动的评估 这也构成了矿场地震危害评价的一部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号