Extension of the Cullinan Diamond Mine No. 1 Shaft underneath the existing operating shaft, with emphasis on rock engineering considerations

机译:在现有操作轴下面的Cullinan钻石矿的延伸轴,重点是岩石工程考虑因素

获取原文
获取原文并翻译 | 示例
           

摘要

In 2012, Cullinan Diamond Mine began an expansion programme with the shaft deepening and development of access to the C-Cut 1 block at approximately 839 m below surface. The expansion programme is funded by a combination of bank loans and retained operating profit generated by the mine. Continuous production during deepening of the No. 1 Shaft, which is the rock hoisting shaft, was therefore critical for sustainability and efficiency as well as overall funding of the project. The deepening method, support design and verification, as well as learning outcomes pertaining to the extension of the No. 1 Shaft underneath the existing operating shaft are summarized, with emphasis on the importance of gaining some understanding of the shaft's host rock mass.
机译:2012年,Cullinan Diamond Mine开始扩展程序,轴深化和开发进入C-Cut 1块在表面下方约839米。 扩建计划由银行贷款组合资助,并保留了矿井产生的营业利润。 因此,在岩石提升轴的1号轴深化过程中连续生产对于可持续性和效率以及项目的整体资金至关重要。 深化方法,支持设计和验证,以及与现有操作轴下的1号轴的延伸有关的学习结果,并强调了对轴主体岩石质量的一些了解的重要性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号