...
首页> 外文期刊>Journal of Petroleum Technology >Considering Time and Space in Drilling and Completion Can Reduce Well Interference
【24h】

Considering Time and Space in Drilling and Completion Can Reduce Well Interference

机译:考虑到钻井和完成时的时间和空间可以减少井干扰

获取原文
获取原文并翻译 | 示例
           

摘要

Development of organic shale reservoirs with large hydraulic-fracture treatments not only poses challenges to the completion of a single well,but also to interference with surrounding wells.A direct consequence of interference is production loss.Therefore,the drilling and completion schedule for field development must be 4D in time and space to account for interaction in between wells.The complete paper describes a physics-based model of interference and a sensitivity study to propose guidelines for well spacing and a drilling timeline for multiple horizontal wells in the Vaca Muerta shale.Effective field development relies on the tradeoff between the capital expenditure(CAPEX)and the production profile generating cash flow.Both CAPEX and the production profile are directly controlled by the number of wells and the pace at which these wells are tied in to the production facilities.With respect to tight rocks,the need for horizontal drilling and hydraulic fracturing adds a layer of geometrical complexity to unlock such resources.
机译:具有大型液压骨折治疗的有机页岩储层的开发不仅构成了一个良好的良好的挑战,而且对整个井的干扰。干扰的直接后果是生产损失。因此,现场开发的钻井和完成时间表必须是4D的时间和空间,以考虑井之间的相互作用。本文介绍了基于物理的干扰模型和灵敏度研究,提出了井间距的准则以及Vaca Muerta Shale中的多个水平井的钻井时间表。有效的现场发展依赖于资本支出(CAPEX)与生产现金流量之间的权衡依赖于生产现金流量的薪酬。止民支出和生产型材直接由这些井与生产设施联系在一起的井数和节奏紧紧的岩石,对水平钻孔和液压压裂的需要增加了一层金属唯一的复杂性来解锁这些资源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号