...
首页> 外文期刊>Journal of the Chinese Institute of Engineers >A DUPLICATION HEURISTIC FOR STATIC SCHEDULING OF TASKS ON DISTRIBUTED MEMORY MULTIPROCESSORS
【24h】

A DUPLICATION HEURISTIC FOR STATIC SCHEDULING OF TASKS ON DISTRIBUTED MEMORY MULTIPROCESSORS

机译:分布式内存多处理器上任务的静态调度复制启发式

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A task duplication heuristic, DSH, was proposed in [11]. The underlying concept of the task duplication heuristic is duplicating some tasks on processors such that the earliest start time of tasks on processors can be reduced, that is, tasks on processors can be executed sooner. This leads to a better scheduling length. In this paper, we propose a more general task duplication heuristic,bottom-up top-down duplication heuristic (BTDH), for static scheduling of directed-acyclic graphs (DAGs) on distributed memory multiprocessors. The key difference between BTDH and DSH is the method used for dupli-cating tasks. BTDH allows tasks to be duplicated on processors even though the duplication of tasks will temporarily increase the earliest start time of some tasks. DSH only allows those duplications which will reduce the earliest start time of tasks. Simulation results show that, for coarse-grain DAGs, the scheduling length of BTDH is almost the same as the scheduling length of DSH. However, for me-dium-grain and fine-grain DAGs, BTDH produces better scheduling length than DSH.
机译:在[11]中提出了一项任务复制启发式拟启发式,DSH。任务复制启发式的潜在概念正在复制处理器上的一些任务,使得可以减少处理器上的任务的最早开始时间,即处理器上的任务可以更快地执行。这导致更好的调度长度。在本文中,我们提出了一个更一般的任务复制启发式,自下而上的自上而下的重复启发式(BTDH),用于在分布式内存多处理器上的定向 - 非循环图(DAG)的静态调度。 BTDH和DSH之间的关键差异是用于Dupli-Cate任务的方法。 BTDH允许在处理器上复制任务,即使任务的重复将暂时增加某些任务的最早开始时间。 DSH仅允许这些重复,这将减少最早的任务开始时间。仿真结果表明,对于粗粒DAG,BTDH的调度长度与DSH的调度长度几乎相同。然而,对于Me-Dium-谷物和细粒度DAG,BTDH产生比DSH更好的调度长度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号