...
首页> 外文期刊>Journal of the Chinese Institute of Engineers >Key challenges in executing energy-savings performance contracts in public buildings: Taiwan experience
【24h】

Key challenges in executing energy-savings performance contracts in public buildings: Taiwan experience

机译:在公共建筑中执行节能绩效合同的关键挑战:台湾经验

获取原文
获取原文并翻译 | 示例

摘要

With the trend toward energy conservation and carbon reduction in public procurement, Energy-Saving Performance Contracting (ESPC) has been getting a lot of attention for lowering the financial burden on the public sector to improve the energy performance of buildings. In Taiwan, there have been 115 ESPC projects worth NT$1.8 billion awarded in the public and private sectors from 2006 to 2014. The practical experience accumulated shows that there still exist deficiencies in the ESPC system, and there are also lessons to be learned. This paper discusses five key challenges of executing energy-saving performance contracts in public building projects. These findings can be helpful for countries and organizations that are applying or intend to apply ESPC to realize more efficient and effective procurement systems and achieve better project performance.
机译:随着节能和公共采购碳减少的趋势,节能绩效合同(ESPC)对降低公共部门的财务负担来提高建筑物的能源绩效,得到了很大的关注。 在台湾,从2006年到2014年,有115个价值115亿美元的项目,价值18亿美元。积累的实际经验表明,ESPC系统中仍然存在缺陷,也有经验教训。 本文讨论了在公共建筑项目中执行节能绩效合同的五个关键挑战。 这些调查结果可能有助于申请或打算申请ESPC实现更有效和有效的采购系统并实现更好的项目绩效的国家和组织。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号