A method to utilize facility siting techniques in the early phases of capital projects to reduce risks and safety spending

机译:一种利用工厂选址技术在资本项目的早期阶段中利用设施选址技术,以降低风险和安全支出

获取原文
获取原文并翻译 | 示例
           

摘要

A common complaint when undertaking capital projects is the cost of engineered designs that must be added late in the project in order to mitigate hazards or risks. Due to the typical phasing of these project activities, the facility siting study (FSS) or other consequence or risk modeling is not completed until the layout of the facility has been established. However, when a site layout is already in a mature state, it can be extremely difficult to move hazards or populations to safer locations due to the substantial amount of rework that would be required. With mitigation through relocation thus limited or even unavailable, increasing the safety systems within the unit or adding layers of protection at the buildings of interest becomes the only option. Costs could be reduced and designs made safer if FSS or similar studies could be conducted earlier in the design process.
机译:在进行资本项目时,共同投诉是工程设计的成本,必须在项目中迟到,以减轻危险或风险。 由于这些项目活动的典型相位,直到设施的布局建立了设施选址研究(FSS)或其他后果或风险建模。 然而,当站点布局已经处于成熟状态时,由于需要的大量返工,将危险或填充移动到更安全的位置可能是极其困难的。 通过搬迁减缓因此受到限制甚至不可用,增加了本机内的安全系统或在感兴趣的建筑物中添加保护层成为唯一的选择。 如果在设计过程中早先进行FSS或类似的研究,则可以减少成本并且设计更安全。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号